Galecopper Bridge
The Galecopper Bridge, located on the A12 near Utrecht, is an important link in the traffic connection between different regions.
Reinforcement and renewal of the Galecopper Bridge
Between 2013 and 2015, the bridge underwent major work on behalf of the Department of Public Works. This renovation focused on strengthening the bridge and renewing the road surface, which was essential for improving traffic flow and meeting modern standards.
During the renovation, the Galecopper Bridge was jacked up, increasing its clearance by 70 cm. This modification ensures that the bridge meets the new standard for Rhine navigation height, which is important for the passage of ships. The renewed road surface and reinforced structure contribute to a longer life of the bridge, allowing it to continue to function as an efficient artery for both automobile and shipping traffic for the next 30 years.
Advantages
Custom-made
Custom-made products for your project. At Archey, we can help you for the right items for your needs.
Large stock
Thanks to the large inventory at Archey, we can respond quickly to your needs and you are always assured of timely delivery of our products.
Quality
Quality fasteners for your projects. At Archey you have come to the right place
Fast delivery
At Archey, we guarantee fast delivery, so you will always have the right fastening solutions on time to continue your projects without delay.
Impact
During the renovation of the Galecopper Bridge, Archey provided essential fastening items that were crucial to the strengthening and renewal of the bridge. Meeting the highest quality standards, the products contributed to the successful execution of the renovation. The use of our fastening solutions allowed the bridge to be prepared for future requirements and service life.
About this project
Projects
Our high-quality fasteners and assembly tools are used internationally in many different projects. Often enough in complex and imposing constructions. That's something we are proud of at Archey.
The LNG import terminal in Wilhelmshaven uses an FSRU to convert LNG to natural gas, with Archey as supplier.
The Boston Flood Barrier protects Boston and Lincolnshire from flooding. Archey supplied special mounting anchors
The Saint-Nazaire offshore wind farm supplies 20% of electricity for Loire-Atlantique. Archey supplies 15,000 kg of fasteners for this project.