Fast delivery

Large stock

Good prices

+31 (0) 85 23 93 200

Good prices

+31 (0) 85 23 93 200

LNG Import Terminal Willemshaven

The Wilhelmshaven LNG import terminal, located in the Port of Wilhelmshaven, is a crucial project that will strengthen the region's energy supply.

An energy supply facility

This advanced terminal will be equipped with a floating storage and regasification unit (FSRU) specifically designed to receive and process LNG tankers. The FSRU will regasify liquefied natural gas (LNG), meaning it will be converted to its usual natural gas form for further distribution and use.

Construction terminal

For the construction of the Wilhelmshaven LNG import terminal, Archey is supplying a wide range of fasteners essential for the construction and installation of the terminal. With our extensive supplier network and more than 40 years of experience in large infrastructure projects, we ensure that all required materials are delivered on time and to the highest quality standards. Our expertise helps meet the project's ambitious deadlines.

Advantages

  • Custom-made

    Custom-made products for your project. At Archey, we can help you for the right items for your needs.

  • Large stock

    Thanks to the large inventory at Archey, we can respond quickly to your needs and you are always assured of timely delivery of our products.

  • Quality

    Quality fasteners for your projects. At Archey you have come to the right place

  • Fast delivery

    At Archey, we guarantee fast delivery, so you will always have the right fastening solutions on time to continue your projects without delay.

  • Impact

    In the realization of the Wilhelmshaven LNG import terminal, Archey's fasteners play a crucial role. Our products have been selected for their reliability and suitability for demanding infrastructure projects. Whether structural fasteners or specialized components, our articles meet the most stringent requirements and standards applicable to such projects.

    About this project

    Projects

    Our high-quality fasteners and assembly tools are used internationally in many different projects. Often enough in complex and imposing constructions. That's something we are proud of at Archey.

  • The LNG import terminal in Wilhelmshaven uses an FSRU to convert LNG to natural gas, with Archey as supplier.

  • The Boston Flood Barrier protects Boston and Lincolnshire from flooding. Archey supplied special mounting anchors

  • The Saint-Nazaire offshore wind farm supplies 20% of electricity for Loire-Atlantique. Archey supplies 15,000 kg of fasteners for this project.