Fast delivery

Large stock

Good prices

+31 (0) 85 23 93 200

Good prices

+31 (0) 85 23 93 200

Rozenburg Lock

The Rozenburg Lock, located near Rotterdam, plays a crucial role in connecting the Caland Canal with the Hartel Canal.

Essential connection at Rotterdam

This important lock, strategically placed for shipping in the region, underwent major work in 2018. These renovations were intended to extend the technical life of the lock so that it remains operational until at least 2038. These investments will allow the Rozenburg Lock to continue to contribute to the efficient flow of shipping traffic in these important waterways.

Renovation

The renovation of the Rozenburg Lock included significant technical upgrades and improvements designed to ensure the lock's performance and reliability. With the completion of this work, the lock can continue to function as an essential link in Rotterdam's port infrastructure. These upgrades contribute to efficient shipping and help support economic activities in the region.

Advantages

  • Custom-made

    Custom-made products for your project. At Archey, we can help you for the right items for your needs.

  • Large stock

    Thanks to the large inventory at Archey, we can respond quickly to your needs and you are always assured of timely delivery of our products.

  • Quality

    Quality fasteners for your projects. At Archey you have come to the right place

  • Fast delivery

    At Archey, we guarantee fast delivery, so you will always have the right fastening solutions on time to continue your projects without delay.

  • Impact

    For the renovation of the Rozenburg Lock, Archey provided a wide range of fastener products that were essential to the success of this project. Our products were selected based on high quality standards and reliability, which is crucial for infrastructure projects of this scale. Archey plays a key role in providing the necessary materials to ensure that the renovation runs smoothly and meets all technical requirements.

    About this project

    Projects

    Our high-quality fasteners and assembly tools are used internationally in many different projects. Often enough in complex and imposing constructions. That's something we are proud of at Archey.

  • The LNG import terminal in Wilhelmshaven uses an FSRU to convert LNG to natural gas, with Archey as supplier.

  • The Boston Flood Barrier protects Boston and Lincolnshire from flooding. Archey supplied special mounting anchors

  • The Saint-Nazaire offshore wind farm supplies 20% of electricity for Loire-Atlantique. Archey supplies 15,000 kg of fasteners for this project.