The renovation of the Schreiers Bridge is necessary because the ring road has been upgraded from an 80 km/h to a 100 km/h freeway. The bridge's drive system requires intensive maintenance and is not sufficiently safe in the current situation.

The challenge

Maintenance cannot be carried out without traffic facilities. The drives are outdated and in need of replacement, in addition, the drives require a lot of maintenance. During this maintenance, the bridge was briefly out of service and the renovation had to be carried out within a short time frame.

Hillebrand

For this project, Hillebrand's work planner asked us if we could deliver very quickly to avoid downtime during the renovation and closure. Within one day he had the requested special 10.9 bolts and corresponding nuts and washers at the requested location . He was very pleased with our solution and service.

Hillebrand is a specialist in building and renovating bridges and locks. It is important in these projects that everything really is delivered on time and at the right location so as not to create any unnecessary delays.

Advantages

  • Custom-made

    Custom-made products for your project. At Archey, we can help you for the right items for your needs.

  • Large stock

    Thanks to the large inventory at Archey, we can respond quickly to your needs and you are always assured of timely delivery of our products.

  • Quality

    Quality fasteners for your projects. At Archey you have come to the right place

  • Fast delivery

    At Archey, we guarantee fast delivery, so you will always have the right fastening solutions on time to continue your projects without delay.

  • Impact

    For the renovation of the bridge, Archey supplied quality 10.9 M42x380 bolts-nuts-rings. These bolts were custom-made at one of our manufacturers and delivered to Friesland by our own truck.

    About this project

    Projects

    Our high-quality fasteners and assembly tools are used internationally in many different projects. Often enough in complex and imposing constructions. That's something we are proud of at Archey.

  • The LNG import terminal in Wilhelmshaven uses an FSRU to convert LNG to natural gas, with Archey as supplier.

  • The Boston Flood Barrier protects Boston and Lincolnshire from flooding. Archey supplied special mounting anchors