The Merwede Bridge, a double arch bridge on the A27 between South Holland and North Brabant, plays a crucial role in through traffic between these two regions.

The challenge
The emergency repairs to the Merwede Bridge required approximately 5,000 HV Injection Bolts. Archey played a key role by providing a detailed quotation to the construction combination VolkerRail & Mercon Steelstructures B.V. (ViVo) on the day of request. Once approved by the Department of Public Works, the HV Injection Bolts were delivered to the construction site within the specified time frame and assembled immediately, contributing to a quick and effective repair of the bridge
The solution
The emergency repairs to the Merwede Bridge required approximately 5,000 HV Injection Bolts. Archey played a key role by providing a detailed quotation to the construction combination VolkerRail & Mercon Steelstructures B.V. (ViVo) on the day of request. Once approved by the Department of Public Works, the HV Injection Bolts were delivered to the construction site within the specified time frame and assembled immediately, contributing to a quick and effective repair of the bridge.
Advantages
Custom-made
Custom-made products for your project. At Archey, we can help you for the right items for your needs.
Large stock
Thanks to the large inventory at Archey, we can respond quickly to your needs and you are always assured of timely delivery of our products.
Quality
Quality fasteners for your projects. At Archey you have come to the right place
Fast delivery
At Archey, we guarantee fast delivery, so you will always have the right fastening solutions on time to continue your projects without delay.
Impact
For the repair of the Merwede Bridge, Archey supplied HV injection garnishes. These trimmings consisted of a regular HV Prestressing Bolt with a 3.2mm hole fully drilled and 50% drilled up by 5.5mm, an HV injection Prestressing Nut, an HV Washer with a recessed chamber and an HV Washer with a vent groove. Our high-quality products meet the specific requirements for such demanding applications and contribute to the structural integrity of the bridge.

About this project
Projects
Our high-quality fasteners and assembly tools are used internationally in many different projects. Often enough in complex and imposing constructions. That's something we are proud of at Archey.
The LNG import terminal in Wilhelmshaven uses an FSRU to convert LNG to natural gas, with Archey as supplier.

The Boston Flood Barrier protects Boston and Lincolnshire from flooding. Archey supplied special mounting anchors

The Saint-Nazaire offshore wind farm supplies 20% of electricity for Loire-Atlantique. Archey supplies 15,000 kg of fasteners for this project.